The is the single source of truth for installing, commissioning, troubleshooting and handing over Kent M1 Hybrid Inverter, Kent G3 Hybrid Inverter and Kent Lithium Battery systems in the field.

A completed Kent New Energy hybrid installation — figure KNB-PH-01

The products

The Kent M1 and Kent G3 are different platforms. Menus, passwords, torques, DIP switches and sequences differ. Never carry a setting from one to the other — each platform has its own pages here, and the checklists keep them separate.

Start with your role

I install systems

The installer path: safety → siting → platform installation → commissioning checklist.

I service systems

The service path: safe isolation → troubleshooting flows → when to escalate.

How this knowledge base works

Applicability badges, validation blocks, and why every number here is traceable.

Safety first

Non-negotiables before touching any Kent New Energy equipment.
Remote monitoring is delivered by Kent Central Command (Centcom) — documentation to follow. Everything in this knowledge base works from the on-device display; no app is required.