Every page on this site prints clean from your browser — press Ctrl/Cmd-P and the page formats for paper. These eight packs are the standard sets a crew carries for each job type. Pull the pages for your job, print them at the office or a print shop, and carry them to site. Kent-stamped combined PDF packs are published on this page as they are released.
Print per page for the cleanest pagination. The checklists and the Handover Form are designed to be filled by hand in the field. The mixed-fleet cheat card prints as a single sheet — every crew working both platforms carries one.

The eight standard packs

1 · Installation Pack

The pages a crew needs from van to wall.All platforms: Safety First · PPE & Tools · Choosing the Location · Mounting & Service AccessKent M1 add: Mounting · PV Wiring · AC Wiring · Battery WiringKent G3 add: Mounting · PV Wiring · AC Wiring · Battery Wiring

2 · Commissioning Pack

3 · Service-Visit Pack

The minimum a service technician carries for a reactive or scheduled visit.Isolation & Shutdown · When to Escalate · plus the symptom page matching the service ticket (start from Troubleshooting: Not Starting and follow the fault)

4 · CT & Meter Pack

For CT placement, direction confirmation, and zero-export setup or diagnosis.CT Basics · Direction & Location · Meter & Phase Matching · Wrong-CT Symptoms · Kent M1 CT & Meter or Kent G3 CT & Meter

5 · Battery & BMS Pack

For battery installation, BMS commissioning, and communication checks.Battery Safety · BMS Comms Basics · Cable Checks · Kent M1 Battery Wiring or Kent G3 Battery Wiring

6 · Photo-Evidence Pack

For commissioning sign-off and audit-ready photo records.Site Photo Checklist — every 📷 point across the commissioning and test pages belongs in this record. Print and tick as you shoot.

7 · Handover Pack

Everything the customer receives and signs at the end of the job.Explaining the System · Backup Can & Can’t · Battery Expectations · Warranty-Safe Usage (the DO/DON’T card) · Handover Form

8 · Field-Audit Pack

For auditing an existing installation against commissioning claims.Common Commissioning Checklist · Site Photo Checklist · Wrong-CT Symptoms · Handover FormThe audit walks what commissioning claimed. Bring the original handover form from the job record where available.

Mixed-fleet crews

If your crew works on both Kent M1 and Kent G3 sites, add the Mixed-Fleet Cheat Card to every pack. It prints as a single A4 sheet with the key differences — torque, TOU units, DIP positions, altitude, GEN port rules, and the crossover-cable rule that is the same on both platforms.
The cheat card is the fastest way to prevent platform-mix mistakes. Print one per technician, laminate it, and keep it in the toolbag.

When to escalate

Escalate to Kent New Energy service only — through your registered Kent partner channel or the Kent service desk details on your work order. Do not contact any third-party or component-manufacturer support line for a Kent-branded system: tickets outside the Kent channel are not tracked, not covered, and can void warranty handling.