Mixed-fleet cheat card: the settings that differ between Kent M1 and Kent G3 — figure KNB-SVG-08
Identity
The dangerous differences
What is the SAME on both platforms
- CT arrow points toward the grid, clamped at the grid connection point — the universal Kent rule.
- Power sequences: ON is grid-AC first; OFF is battery first (exact reverse). The steps live on each platform’s commissioning page.
- Battery window 40–60 V DC, BMS over CAN, and the Kent Lithium Battery’s 4-5 crossover comm cable rule.
- CT ratio is read off the shipped CT’s nameplate — never assumed. [KNB-VAL-08]
- Datalogger: fit physically, keep the port clean — activated with Kent Central Command — documentation to follow.
- Escalation: Kent New Energy service only.