Check first
- Trace shape: spikes or sustained? Momentary blips on load steps are the control loop’s physics; sustained export is the fault.
- CT live test — grid on, PV off must read import. A reversed or misplaced CT is the number-one cause.
- Third-party grid-tie inverter on site? If yes, that generation is uncontrollable by the Kent hybrid — expectation case, not settings case.
Close it properly
A zero-export fix ends with the witness test against the utility meter — PV high, load minimised, no sustained export above the limit — photographed into the record. 📷Escalate when
- Sustained export persists with the CT proven and settings verified — settings snapshot and export trace go to Kent service.
- A DISCOM dispute is open — escalate to Kent with the commissioning record and witness evidence; the compliance response runs through Kent, not the installer.
Escalate to Kent New Energy service only — through your registered Kent partner channel or the Kent service desk details on your work order. Do not contact any third-party or component-manufacturer support line for a Kent-branded system: tickets outside the Kent channel are not tracked, not covered, and can void warranty handling.